{"id":1012,"date":"2024-03-11T10:52:53","date_gmt":"2024-03-11T10:52:53","guid":{"rendered":"https:\/\/agenergyaustralia.com.au\/?page_id=1012"},"modified":"2026-02-19T09:50:13","modified_gmt":"2026-02-19T09:50:13","slug":"battery-energy-storage-system","status":"publish","type":"page","link":"https:\/\/agenergyaustralia.com.au\/?page_id=1012","title":{"rendered":"Battery Energy Storage System"},"content":{"rendered":"\n<div class=\"wp-block-uagb-container uagb-block-40346aac alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<h1 class=\"wp-block-heading\">Battery Energy Storage System<\/h1>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-fa2db7b8 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<h2 class=\"wp-block-heading\">Attributes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When assessing land for a Battery Energy Storage System (BESS), many of the same principles apply as for solar and wind projects, though without reliance on wind speed or solar irradiance. BESS facilities require open land to accommodate battery containers, inverters, transformers and associated infrastructure, with flat or gently sloping terrain preferred to support efficient construction and long-term operation. Land requirements vary by project capacity and configuration, typically ranging from several hectares depending on scale.\u200b<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proximity to existing transmission infrastructure is critical to enable efficient grid integration, minimise connection costs and reduce development risk. Consideration is also given to future transmission upgrades and Renewable Energy Zones to ensure long-term viability. While BESS projects generally have a lower environmental footprint than wind farms, early environmental assessment remains essential to manage exclusion zones, regulatory requirements and ecological impacts. Adequate road access is required to support construction and ongoing maintenance activities. Financial viability is assessed through a detailed understanding of market dynamics, revenue pathways, costs and regulatory frameworks. As with solar and wind, BESS projects are well suited to underutilised or lower-productivity land, allowing agricultural operations to continue alongside the infrastructure.\u200b<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jim and Jo are farming landholders progressing a Battery Energy Storage System (BESS) in development at Widgee Creek. Like many farming families, they are seeking to diversify income and create long-term security while maintaining productive cattle operations. The project has been shaped to coexist with day-to-day farming, with planned upgrades to internal access roads, firebreaks and ongoing site maintenance expected to deliver practical on-farm benefits. Their experience progressing Widgee Creek BESS underpins Ag Energy Australia\u2019s <strong>Farmers for <\/strong><strong>Farmers<\/strong> philosophy, demonstrating how renewable energy projects can be developed in partnership with landowners to deliver aligned, long-term outcomes.&nbsp;<\/p>\n<\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-container uagb-block-304552f8 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<h2 class=\"wp-block-heading\">What we look for<\/h2>\n\n\n\n<div class=\"wp-block-uagb-icon-list uagb-block-e4873ac3\"><div class=\"uagb-icon-list__wrap\">\n<div class=\"wp-block-uagb-icon-list-child uagb-block-62841f83\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M80 96C80 78.33 94.33 64 112 64H176C193.7 64 208 78.33 208 96H304C304 78.33 318.3 64 336 64H400C417.7 64 432 78.33 432 96H448C483.3 96 512 124.7 512 160V384C512 419.3 483.3 448 448 448H64C28.65 448 0 419.3 0 384V160C0 124.7 28.65 96 64 96H80zM384 192C384 183.2 376.8 176 368 176C359.2 176 352 183.2 352 192V224H320C311.2 224 304 231.2 304 240C304 248.8 311.2 256 320 256H352V288C352 296.8 359.2 304 368 304C376.8 304 384 296.8 384 288V256H416C424.8 256 432 248.8 432 240C432 231.2 424.8 224 416 224H384V192zM96 256H192C200.8 256 208 248.8 208 240C208 231.2 200.8 224 192 224H96C87.16 224 80 231.2 80 240C80 248.8 87.16 256 96 256z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Location and Land Size<\/strong>:\u00a0BESS sites require flat, open land to accommodate battery containers and supporting infrastructure. While not dependent on wind or solar resource, location remains critical. BESS projects are well suited to unproductive land and can be attractive for landholders with multiple parcels. Depending on project capacity, a <strong>minimum land area of approximately 2 hectares (\u22485 acres)<\/strong> is typically required.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-618e8c30\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M80 96C80 78.33 94.33 64 112 64H176C193.7 64 208 78.33 208 96H304C304 78.33 318.3 64 336 64H400C417.7 64 432 78.33 432 96H448C483.3 96 512 124.7 512 160V384C512 419.3 483.3 448 448 448H64C28.65 448 0 419.3 0 384V160C0 124.7 28.65 96 64 96H80zM384 192C384 183.2 376.8 176 368 176C359.2 176 352 183.2 352 192V224H320C311.2 224 304 231.2 304 240C304 248.8 311.2 256 320 256H352V288C352 296.8 359.2 304 368 304C376.8 304 384 296.8 384 288V256H416C424.8 256 432 248.8 432 240C432 231.2 424.8 224 416 224H384V192zM96 256H192C200.8 256 208 248.8 208 240C208 231.2 200.8 224 192 224H96C87.16 224 80 231.2 80 240C80 248.8 87.16 256 96 256z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Connection Infrastructure<\/strong>: Proximity to existing substation infrastructure is essential to enable efficient grid connection and minimise cost and complexity, consistent with other utility-scale renewable projects.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-3f93399f\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M80 96C80 78.33 94.33 64 112 64H176C193.7 64 208 78.33 208 96H304C304 78.33 318.3 64 336 64H400C417.7 64 432 78.33 432 96H448C483.3 96 512 124.7 512 160V384C512 419.3 483.3 448 448 448H64C28.65 448 0 419.3 0 384V160C0 124.7 28.65 96 64 96H80zM384 192C384 183.2 376.8 176 368 176C359.2 176 352 183.2 352 192V224H320C311.2 224 304 231.2 304 240C304 248.8 311.2 256 320 256H352V288C352 296.8 359.2 304 368 304C376.8 304 384 296.8 384 288V256H416C424.8 256 432 248.8 432 240C432 231.2 424.8 224 416 224H384V192zM96 256H192C200.8 256 208 248.8 208 240C208 231.2 200.8 224 192 224H96C87.16 224 80 231.2 80 240C80 248.8 87.16 256 96 256z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Environmental Considerations<\/strong>:\u00a0Given the relatively small footprint of BESS facilities, exclusion zones and environmental constraints are typically managed outside the development footprint wherever possible.<\/span><\/div>\n\n\n\n<div class=\"wp-block-uagb-icon-list-child uagb-block-f08f73d8\"><span class=\"uagb-icon-list__source-wrap\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 512 512\"><path d=\"M80 96C80 78.33 94.33 64 112 64H176C193.7 64 208 78.33 208 96H304C304 78.33 318.3 64 336 64H400C417.7 64 432 78.33 432 96H448C483.3 96 512 124.7 512 160V384C512 419.3 483.3 448 448 448H64C28.65 448 0 419.3 0 384V160C0 124.7 28.65 96 64 96H80zM384 192C384 183.2 376.8 176 368 176C359.2 176 352 183.2 352 192V224H320C311.2 224 304 231.2 304 240C304 248.8 311.2 256 320 256H352V288C352 296.8 359.2 304 368 304C376.8 304 384 296.8 384 288V256H416C424.8 256 432 248.8 432 240C432 231.2 424.8 224 416 224H384V192zM96 256H192C200.8 256 208 248.8 208 240C208 231.2 200.8 224 192 224H96C87.16 224 80 231.2 80 240C80 248.8 87.16 256 96 256z\"><\/path><\/svg><\/span><span class=\"uagb-icon-list__label\"><strong>Access and Infrastructure<\/strong>:\u00a0Robust road access is essential to support the transport and installation of large, heavy battery equipment during construction, as well as ongoing maintenance activities.<\/span><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Battery Energy Storage System Attributes When assessing land for a Battery Energy Storage System (BESS), many of the same principles apply as for solar and wind projects, though without reliance on wind speed or solar irradiance. BESS facilities require open land to accommodate battery containers, inverters, transformers and associated infrastructure, with flat or gently sloping [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"disabled","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-1012","page","type-page","status-publish","hentry"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false},"uagb_author_info":{"display_name":"agenergyaustralia.com.au","author_link":"https:\/\/agenergyaustralia.com.au\/?author=1"},"uagb_comment_info":0,"uagb_excerpt":"Battery Energy Storage System Attributes When assessing land for a Battery Energy Storage System (BESS), many of the same principles apply as for solar and wind projects, though without reliance on wind speed or solar irradiance. BESS facilities require open land to accommodate battery containers, inverters, transformers and associated infrastructure, with flat or gently sloping&hellip;","_links":{"self":[{"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=\/wp\/v2\/pages\/1012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1012"}],"version-history":[{"count":3,"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=\/wp\/v2\/pages\/1012\/revisions"}],"predecessor-version":[{"id":1231,"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=\/wp\/v2\/pages\/1012\/revisions\/1231"}],"wp:attachment":[{"href":"https:\/\/agenergyaustralia.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}